  • Projects Handled

    • Capex int’l – Civil and Steel fabrication, machine installation & mechanical works. 2014
    • SNOC – Gas plant showdown work for repair water tank. 2018
    • Nestle Waters – plant erection work. Includs stainless steel 316L pipe line installation, structural steel, electrical work, and Air condition work, and Air curtain work. 2009-2010
    • Coca cola: production line pipe work. Air compressor line work. PPR piping for utility. And related structural work. 2011
    • Oasis water- Pipe line installation project. PVC and SS 316 L pipelines. 2011
    • IFFCO – Structural steel work. 2012
    • International Royal Bakery. Al Ain – Piping net working for all plant, chiller piping. And installation of pumps and installation of Heat Exchanger. Supply and installation of Spiral –exhaust Duct with exhaust fan for the Bakery. 2012, 2014 & 2015
    • Al Rawabi – Fabrication and erection work for the water Tank Roofing. 2008