SNOC – Gas plant showdown work for repair water tank. 2018
Nestle Waters – plant erection work. Includs stainless steel 316L pipe line installation, structural steel, electrical work, and Air condition work, and Air curtain work. 2009-2010
Coca cola: production line pipe work. Air compressor line work. PPR piping for utility. And related structural work. 2011
Oasis water- Pipe line installation project. PVC and SS 316 L pipelines. 2011
IFFCO – Structural steel work. 2012
International Royal Bakery. Al Ain – Piping net working for all plant, chiller piping. And installation of pumps and installation of Heat Exchanger. Supply and installation of Spiral –exhaust Duct with exhaust fan for the Bakery. 2012, 2014 & 2015
Al Rawabi – Fabrication and erection work for the water Tank Roofing. 2008